Natural Shield Application

 In

STAGE 1 – REMOVAL OF DEBRIS

  • HOW : Sweep debris off surface and loose surface

PURPOSE : No debris in sealer

  • HOW : Use Natural Shield (water-based penetrating sealer)

PURPOSE : Creates flat finish:

1. Penetrating seal w/ chemical reaction
2. Waterproof
3. Moisture mitigation

STAGE 2 – SEALER APPLICATION

  • HOW : Apply the sealer with a 1/4” nap roller, HVLP sprayer, pump sprayer, or airless sprayer with tip size 17. Minimum of 3 coats are required to ensure maximum performance

PURPOSE : Ensures proper application. Does not allow to puddle, will create a white haze if puddled

  • HOW : Apply the first coat and DO NOT ALLOW THE SEALER TO DRY BEFORE APPLYING SECOND AND THIRD COATS. Do not allow to puddle

PURPOSE : Ensures penetration. If sealer dries before additional coats it may not bond properly

  • HOW : Repeat the application to a minimum of 3 coats. Additional coats may be required depending on the porosity of the surface (X-Bond requires, 3 coats only, other surfaces such as concrete or block may require additional coats)

PURPOSE : Avoids hazing – ensures penetration

VERTICAL SURFACES

  • HOW : Apply the sealer with a 1/4” nap roller, HVLP sprayer, or airless sprayer with tip size 15. Start application from bottom to top to avoid runs in the sealer. Avoid over-spraying. Minimum of 3 coats is required to ensure maximum performance.

PURPOSE : Ensures proper sealing application, avoids runs in the sealer